91˿Ƶ

Please be advised that 91˿Ƶ has mandated Adams Elevators Inc. to carry out the following project:17-004 Burnside - Modernization of the elevators.

Construction start date (UPDATED): June 2024

Planned construction end date:March 2025

Work schedule:Monday to Friday 6 a.m. to 3 p.m.

Project Manager:Simon Lacoste -simon.lacoste [at] mcgill.ca

Classified as: Burnside Hall
Published on: 8 Apr 2024

Please be advised that 91˿Ƶ has mandated St-Denis Thompson to carry out the following project:16-135 Strathcona Music – Rehabilitation of building envelope Lot 4.

Building envelope restoration of South, East and North stone masonry facades. Construction is expected to last three years and will be carried out during the spring, summer and fall periods of 2024, 2025 and 2026.

Construction start date: April 2024

Planned construction end date: November 2026

Classified as: Strathcona Music
Published on: 3 Apr 2024

91˿Ƶ has mandated CORENOV to carry out the following project: 19-117 Rutherford Building – CFI IF 2020, Brunner.

The project consists of renovating room 025 in the first basement of Rutherford Building to accommodate new equipment for the lab. Minor interventions will take place in rooms 003, 024A, 026, 027, 029A,030, B1-HALL2 & B1-HALL5A.

Construction start date:March 25, 2024

Planned construction end date:End of September 2024

Classified as: Rutherford Building
Published on: 21 Mar 2024

91˿Ƶ has mandated F.A.M.G. Contractors to carry out the following project: 14-140 Life Sciences Complex – Address water leaks in curtain wall.

The work consists of stripping the outer layer of the wall of the mechanical shaft at room 140. The wall will remain stripped for a short period of time to complete the survey before proceeding with reconstruction.

This is the first phase of the project that soon will address the repair of damages in the mechanical shaft at room 140.

Construction start date:March 18, 2024

Published on: 14 Mar 2024

91˿Ƶ has mandated Construction G.E.P. Inc. to carry out the following project:McIntyre, Stewart Biology North Wing, Life Sciences, and Ludmer / 23-005 - Repairs in various research spaces.

This project includes necessary repairs in various research spaces across the downtown campus. Repair work includes patching floor finishes, painting walls and ceilings, and new window covers.

Project manager:Emika Marinacci -Emika.marinacci [at] mcgill.ca

Published on: 28 Feb 2024

91˿Ƶ has mandated Corenov to carry out the following project: Life Science Complex / 21-049 - CFI BRIF Vidal.

The project consists of renovating the CL3 laboratory in Life Sciences to accommodate new equipment and facilitate future maintenance work for the facility.

Project manager: Emika Marinacci -emika.marinacci [at] mcgill.ca

Assistant project manager: Christine Torres -christine.torres [at] mcgill.ca

Classified as: Life Science Complex
Published on: 29 Jan 2024

91˿Ƶ has mandated Procova Incto carry out the following project: McIntyre Medical / 23-002- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:Wendy Rivera -wendy.rivera [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 22 Jan 2024

91˿Ƶ has mandated Corenov Constructeurs Incto carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:Mona Modarressi - mona.modarressi [at] mcgill.ca

Assistant project managers:Mark Grzywacz - mark.grzywacz [at] mcgill.ca; Thomas Perreault - thomas.perreault [at] mcgill.ca

Construction start:December 2023

Classified as: Wong Building
Published on: 30 Nov 2023

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

Temporary classroom modules on a field

Classified as: Centennial Centre
Published on: 30 Nov 2023

91˿Ƶ has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: parasitology
Published on: 30 Nov 2023

91˿Ƶ has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: Centennial Centre
Published on: 20 Nov 2023

91˿Ƶ has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager:Johanne Guertin - Johanne.guertin [at] gph-inc.com

Assistant project manager:Gabriel Fortin -Gabriel.fortin [at] gph-inc.com

Construction start date:November 14, 2023

Classified as: MNI, Montreal Neurological Institute
Published on: 8 Nov 2023

91˿Ƶ has mandated Planit Construction to carry out the following project:MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 91˿Ƶ Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

Published on: 8 Nov 2023

91˿Ƶ has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:Mark Ouimet –mark.ouimet [at] mcgill.ca

Assistant project manager: Claudia Carpanzano-Claudia.carpanzano [at] mcgill.ca

Classified as: Macdonald Campus, Macdonald Stewart Building
Published on: 19 Sep 2023

91˿Ƶ has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:Eric Boutet, CIMA+ - eric.boutet [at] cima.ca">eric.boutet [at] cima.ca

Classified as: MNI, Montreal Neurological Institute
Published on: 19 Sep 2023

Pages

Back to top